Electricity
Rates rates subject to change
General Power Rate - Schedule GSA
Base Charges
| Part A: Less Than 50 kW |
|
| Customer Charge |
11.36 |
| First 1,500 kWh |
0.07892 |
| Additional kWh |
0.07892 |
| Part A: 51 - 1,000 kW |
|
| Customer Charge |
11.36 |
| 51 - 1,000 kW |
12.80 |
| First 15,000 kWh |
0.08158 |
| Additional kWh |
0.04007 |
| Part A: 1,001 - 5,000 kW |
|
| Customer Charge |
11.36 |
| 0 - 1,000 kW |
11.91 |
| 1,000 - 5,000
kW |
|
| All kWh |
0.04064 |
| Part B Standard: 5,001 - 15,000 kW |
|
| Customer Charge |
1,500.00 |
| All kW |
12.95 |
| First 620 kWh per kW |
0.03437 |
| Additional kWh per kW |
0.02806 |
| Part B Manufacturing: < 5,000 kW |
|
| Customer Charge |
1,500.00 |
| All kW |
11.18 |
| First 620 kWh per kW |
0.02928 |
| Additional kWh per kW |
0.02389 |
| Part B Manufacturing: 5001 - 15,000 kW |
|
| Customer Charge |
1,500.00 |
| All kW |
10.61 |
| First 620 kWh per kW |
0.02781 |
| Additional kWh per kW |
0.02272 |
| Part C Standard: 15,001 - 25,000 kW |
|
| Customer Charge |
1,500.00 |
| All kW |
12.34 |
| First 620 kWh per kW |
0.03437 |
| Additional kWh per kW |
0.02806 |
| Part C Manufacturing: 15,001 - 25,000 kW |
|
| Customer Charge |
1,500.00 |
| All kW |
10.00 |
| First 620 kWh per kW |
0.02781 |
| Additional kWh per kW |
0.02272 |
| Outdoor Lighting: |
|
| Customer Charge |
10.27 |
| All kWh per month |
0.05191 |
| Facility Charge |
9.00% |
Water System
rates subject to change
Water Source - Tennessee River Mile 592.3 (Watts Bar)
Plant Capacity - 12,000,000 gallons per day
Current Peak Demand - 10,000,000 gallons per day
Residential, Commercial, and
Industrial
|
Inside City Limits |
Outside City Limits |
| Customer Charge |
$9.00 |
$9.00 |
| Rate per 1,000 gallons (all usage)
|
1.70 |
2.55 |
Industrial customers
both inside and outside the corporate limits and with estimated
usage of 100,000 gallons or more will be subject to minimum
bills as follows:
| Meter
Size |
Minimum Bill |
| 2 inch |
$100.00 |
| 3 inch |
115.00 |
| 4 inch |
140.00 |
| 5 inch |
175.00 |
| 6 inch |
225.00 |
Waste Water
System rates subject to change
Plant Capacity - 14,000,000 gallons per day
Current Peak Demand - 10,000,000 gallons per day
Type of Sewage Treatment - Activated Sludge
| |
Inside City Limits
|
Outside City Limits |
| Customer Charge |
$9.00 |
$9.00 |
| Rate for All Usage |
1.90 |
2.85 |
A minimum bill
for customers with a 2-inch water meter or larger shall
be:
| Meter
Size |
Minimum
Bill
Inside
City Limits |
Minimum
Bill
Outside
City Limits |
|
| 2 inch |
$120.00 |
$180.00 |
|
| 3 inch |
140.00 |
210.00 |
|
| 4 inch |
180.00 |
270.00 |
|
| 5 inch |
240.00 |
360.00 |
|
| 6 inch |
320.00 |
480.00 |
|
Wastewater effluent
requirements are listed in section 8-304(3) of Loudon's
Sewer Use Ordinance.
Natural Gas
Pipeline - East Tennessee Natural Gas Pipeline
BTU Content Per Cubic Foot - 1,035 average
Natural gas rates
fluctuate monthly based on the market rate for natural gas.
<< Back |
| Lenoir
City Utilities Board |
| Providing Utility Service to: Fort Loudoun Industrial Park,
Spring Cress Business Park, and a portion of Sugarlimb Industrial
Park |
|
Electricity Rates subject to change
General Power Rate - Schedule GSA
Base Charges
- If the higher of the customer's currently effective
contract demand, if any, or its highest billing demand
during the last 12-month period is not more than 50 kW
and the kWh is not more than 15,000:
- Customer Charge: $12.20 per delivery point
per month
- Energy Charge: 8.182 cents per kWh
- If the higher of the customer's currently effective
contract demand or its highest billing demand during the
latest 12-month period is greater than 50 kW but not more
than 1,000 kW or the kWh used is greater than 15,000:
- Customer Charge: $24.41 per delivery point
per month
- Demand Charge: First 50 kW of billing demand
per month, no demand charge
Excess over 50 kW of billing demand per month at $12.26
per kW
- Energy Charge: First 15,000 kW per month 8.182
cents per kWh
Additional kWh per month at 4.133 cents per kWh
- If the higher of the customer's currently effective
contract demand or its highest billing demand during the
latest 12-month period is greater than 1,000 kW but not
more than 2,500 kW:
- Customer Charge: $55.93 per delivery point
per month
- Demand Charge: First 1,000 kW of billing demand
per month at $12.32 per kW
Next 1,500 kW of billing demand per month at $13.50
per kW
- Energy Charge: 4.133 cents per kWh per month
- If the higher of the customer's currently effective
contract demand or its highest billing during the latest
12-month period is greater than 2,500 KW but not more
than 5,000 kW:
- Customer Charge: $55.93 per delivery point
per month
- Demand Charge: First 1,000 kW of billing demand
per month at $12.32 per kW
Next 1,500 kW of billing demand per month at $13.50
per kW
Excess over 2,500 kW of billing demand per month at
$13.92 per kW plus an additional $13.92 per KW per month
for each kW, if any, of the amount by which the customer's
billing demand exceeds the higher of 2,500 kW or its
contract demand
Water System rates subject to change
Plant Capacity = 3,000,000 gallons per day at the Lenoir
City plant and 700,000 gallons per day at the Muddy Creek
Plant
Current Average Demand = 2,000,000 gallons per day
| Commercial/Industrial Rates |
|
| First 2,000 gallons or less |
$12.21 |
| Next 3,000 gallons |
4.89 |
| Over 95,000 gallons |
3.65 |
| Excess of 100,000 gallons |
2.63 |
| Flat Rate |
23.68 |
Waste Water System rates subject to change
Plant Capacity = 2,000,000 gallons per day
Current Average Demand = 1,000,000 gallons per day
| Commercial/Industrial Rates |
Inside City Limits
|
Outside City Limits |
| First 2,000 gallons or less |
$15.92 |
$16.32 |
| Next 3,000 gallons |
6.39 |
8.00 |
| Next 45,000 gallons |
4.75 |
6.12 |
| Next 50,000 gallons |
4.24 |
5.76 |
| Excess over 100,000 gallons |
3.42 |
5.58 |
Natural Gas rates subject to change
Pipeline - East Tennessee Natural Gas
Cost adjustments based on the wholesale cost
Natural gas rates
fluctuate monthly based on the market rate for natural gas.
<< Back
|
| TVA
Energy Programs Affecting Basic Electric Rates |
|
Variable Priced Interruptible (VPI)
- Available to customers with actual kW demands over 5,000
kW. Several VPI programs with different rate structures
exist for customers willing to curtail their power usage
within 5 to 30 minutes notifications by TVA. The amount
to curtail is contracted as VPI and the remainder of the
total load is contracted as the standard firm power rates.
The electricity portion contracted as VPI is billed with
a reduced charge for kW demand and the kWh charge is variable,
based on TVA's cost to produce plus a markup. Possible savings
of between 20-30% can be realized. The energy charge will
be dependent upon the customer's ability to use VPI. There
are various curtailment time periods for different VPI levels.
- Start-Up and Test Power - Firms can be eligible for
start-up and test power which eliminates demand charge
for 6 months
- Expanded Growth Credit Program - TVA sponsored growth
credit savings program for the first 3 years of a new
or expanding firms. The credit is $6.00 per kW demand.
A summary of the program follows:
- Program's objective is to encourage new and expanded
electrical loads where the price of electricity significantly
impacts location, expansion, or fuel choice decisions.
- Eligibility is based on Standard Industrial Classification
(SIC) codes, and on the size of the new load or expansion
load. Qualifying commercial and industrial groups
are mining, manufacturing, transportation, electric,
gas, and sanitary services. The actual determination
for qualification is based on the SIC code.
- The minimum new load to qualify for the program
must be at last 100 kW. For expansion customers, the
new load (expansion load) must be at least 100 kW
greater than the highest load in the previous 12 months.
- The program deducts $6.00 per kW from the demand
charge for 3 years.
<< Back |
|